Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertAugust 29, 20230 comments

A 7 tunnel construction in Altona: traffic difficulties

The traffic will be reorganised over several consecutive nights, including lane reductions and a night-time closure of the northbound carriageway between the junction HH-Othmarschen (29) and junction HH-Volkspark (27).

From Thursday, July 27, until the first quarter of 2024 at the HH-Othmarschen (29) junction
• no left turn for traffic from the direction of Wedel on the A7
– drivers can use the northbound slip lane at the HHBahrenfeld (28) junction.

From 10:00 PM on Saturday, July 29, to 9:00 AM on Sunday, July 30,
• nighttime closure of the northbound/Flensburg carriageway
• from 9:00 PM all junctions between HH-Othmarschen (29) and HH-Volkspark (27) will be closed.
Since no adequate diversion exists at HH-Othmarschen (29), traffic has to be diverted over longer routes!

The following diversions are available:
A wide diversion from the Maschener Kreuz (36) via the A 1, A 21 and B 205 is available for northbound transit traffic.
The official city diversion in the direction of Flensburg starts from the HH-Heimfeld junction (32) via the obligatory diversion U7 via the B 73 and B 75 to the Elbe bridges, further on the B 4 to get to the individual districts or further to the AS HH-Volkspark (27) or AS HH-Stellingen (26) to get back on the A7.

Oversize and abnormal transports:
A waiting zone will be set up on the A7 north of the Elbe tunnel at the HH-Othmarschen (29) junction for vehicles carrying oversize and abnormal loads that have already been approved. Depending on the type of approval, the intention of driving through the Elbe tunnel should be reported as usual by telephone one hour in advance, upon which vehicles can enter the waiting zone north of the Elbe tunnel on the A7. From there, vehicles will be guided through the closed-off section on request!

Ein Lkw-Verbot an der Grenze zwischen Österreich und LiechtensteinPrev
Belgium: closure of the Kennedy Tunnel in AntwerpNext

Latest Posts

by

Slovakia eases truck bans on November 1

Good news for carriers planning routes through Slovakia at the beginning of November. At the request of the ČESMAD Slovakia association, the Presidium of...

Slovakia eases truck bans on November 1

Unkategorisiert, UnkategorisiertNovember 11, 2025
by

New Weight Restrictions on National Roads No. 7 and No. 64 in Hungary

Starting Monday, November 3, permanent weight limits for heavy goods vehicles will come into effect on two major routes in western Hungary - National Road...

New Weight Restrictions on National Roads No. 7 and No. 64 in Hungary

UnkategorisiertNovember 11, 2025
by

New Permit for Truck Traffic on October 31: Brandenburg Clarifies Transit Rules

The authorities of Brandenburg have issued a general exemption from the holiday truck traffic ban. The exception applies on October 31 (Reformation Day) in...

New Permit for Truck Traffic on October 31: Brandenburg Clarifies Transit Rules

UnkategorisiertNovember 7, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten