Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertAugust 29, 20230 comments

A 7 tunnel construction in Altona: traffic difficulties

The traffic will be reorganised over several consecutive nights, including lane reductions and a night-time closure of the northbound carriageway between the junction HH-Othmarschen (29) and junction HH-Volkspark (27).

From Thursday, July 27, until the first quarter of 2024 at the HH-Othmarschen (29) junction
• no left turn for traffic from the direction of Wedel on the A7
– drivers can use the northbound slip lane at the HHBahrenfeld (28) junction.

From 10:00 PM on Saturday, July 29, to 9:00 AM on Sunday, July 30,
• nighttime closure of the northbound/Flensburg carriageway
• from 9:00 PM all junctions between HH-Othmarschen (29) and HH-Volkspark (27) will be closed.
Since no adequate diversion exists at HH-Othmarschen (29), traffic has to be diverted over longer routes!

The following diversions are available:
A wide diversion from the Maschener Kreuz (36) via the A 1, A 21 and B 205 is available for northbound transit traffic.
The official city diversion in the direction of Flensburg starts from the HH-Heimfeld junction (32) via the obligatory diversion U7 via the B 73 and B 75 to the Elbe bridges, further on the B 4 to get to the individual districts or further to the AS HH-Volkspark (27) or AS HH-Stellingen (26) to get back on the A7.

Oversize and abnormal transports:
A waiting zone will be set up on the A7 north of the Elbe tunnel at the HH-Othmarschen (29) junction for vehicles carrying oversize and abnormal loads that have already been approved. Depending on the type of approval, the intention of driving through the Elbe tunnel should be reported as usual by telephone one hour in advance, upon which vehicles can enter the waiting zone north of the Elbe tunnel on the A7. From there, vehicles will be guided through the closed-off section on request!

Ein Lkw-Verbot an der Grenze zwischen Österreich und LiechtensteinPrev
Belgium: closure of the Kennedy Tunnel in AntwerpNext

Latest Posts

by

Border with Bosnia and Herzegovina closed to trucks. Drivers’ protest continues

Since the early morning of September 1, 2025, a protest at the Ličko Petrovo Selo – Izačić border crossing has completely paralyzed freight traffic between...

Border with Bosnia and Herzegovina closed to trucks. Drivers’ protest continues

Unkategorisiert, Unkategorisiert, UnkategorisiertOktober 11, 2025
by

From 8 September: Changes in traffic management on Slovenia’s H4. Trucks restricted to one lane

On Slovenia’s expressway H4 in the Vipava area, a new traffic management scheme will be introduced starting 8 September 2025. The decision was taken...

From 8 September: Changes in traffic management on Slovenia’s H4. Trucks restricted to one lane

Unkategorisiert, Unkategorisiert, UnkategorisiertOktober 11, 2025
by

Bulgaria introduces temporary truck bans >12 tons at the beginning of September

Carriers planning journeys through Bulgaria must prepare for temporary restrictions on the movement of trucks over 12 tons. The bans are related to the...

Bulgaria introduces temporary truck bans >12 tons at the beginning of September

Unkategorisiert, Unkategorisiert, UnkategorisiertOktober 11, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten