Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertApril 25, 20220 comments

A 7 full closure starting on Friday

The following traffic restrictions are to be expected during the full closure of the A7 from 9 p.m. on Friday, February 25, to 5 a.m. on Monday, February 28.

• The northbound carriageway in the direction of Flensburg will be closed between the HH-Heimfeld (32) and HH-Volkspark (27) junctions
• The southbound carriageway in the direction of Hannover will be closed between the HH-Volkspark junction (27) and the HH-Heimfeld junction (32).

The junctions themselves will be closed from 9 p.m. on Friday to set up the full closure, with the exception of the northbound carriageway at AS HH-Waltershof, which will not be closed until 9:45 p.m. on Friday.

The following routes to reach particular destinations and diversions for long-distance traffic are recommended during the 55-hour closure.
• for long-distance traffic – the diversion via the A1, A21 and B205 from the Hamburg-Maschen / Horster Dreieck junction to the north and from the Neumünster junction to the south. Due to continuing construction work on the A 21, this diversion route is limited to one lane in each direction, but traffic can continue without interruptions.
• Drivers travelling to Hamburg along the A7 can use the following routes to relieve traffic in the city road network:
• Drivers traveling in the direction of Hanover should follow the “Elbbrücken” signs from the HH-Volkspark junction (27) or already at the HH-Stellingen junction (26) (via Kieler Straße, Eimsbütteler Marktplatz).

The following route options are also available:
• Drivers coming from the north, bound for the city center, can drive from the AS HH-Schnelsen-Nord via the airport bypass B 432 and B 433 and the Alsterkrugchaussee or
• to reach the city center from AS HH-Schnelsen via Kollaustrasse.

Spain: full closure of the A-3 carriageway in the direction of ValenciaPrev
Slowakei: vorübergehende Aussetzung des Lkw-FahrerstreiksNext

Latest Posts

by

Slovakia: New Penalties for Drivers and Fewer Restrictions for Trucks During Holidays

The Government of Slovakia approved on November 5 a draft comprehensive amendment to the Road Traffic Act. The changes are set to take effect on May 1,...

Slovakia: New Penalties for Drivers and Fewer Restrictions for Trucks During Holidays

Unkategorisiert, UnkategorisiertDezember 4, 2025
by

Hamburg: Köhlbrand Bridge closed. Detours for trucks over the weekend

One of Hamburg’s main port connections will be completely closed this coming weekend. The Köhlbrand Bridge will be inaccessible from Friday, November 14 at...

Hamburg: Köhlbrand Bridge closed. Detours for trucks over the weekend

Unkategorisiert, UnkategorisiertDezember 4, 2025
by

Netherlands closes A7: detours for trucks, delays up to 90 minutes

On the night from Tuesday, November 18 to Wednesday, November 19, between 11:00 p.m. and 5:00 a.m., the A7 motorway (section at the Afsluitdijk entrance) in...

Netherlands closes A7: detours for trucks, delays up to 90 minutes

UnkategorisiertDezember 4, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten