Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertApril 25, 20220 comments

Slovakia: complete closures of tunnels

In April, May and June, regular spring maintenance and inspection work will be carried out in the undergound tunnels of Sitina, Horelica, Šibenik, Považský Chlmec, Bôrik, Prešov, Žilina, Ovčiarsko, Branisko, Svrčinovec, Polana, and Lučivná.

Traffic will be diverted to parallel roads. The complete closure of the tunnels is expected on the following days:
SITINA tunnel
• from 10:00 PM on April 1 to 10:00 AM on April 2
• from 10:00 PM on April 2 to 10:00 AM on April 3
• from 10:00 PM on April 3 to 4:00 AM on April 4
• from 10:00 PM on April 8 to 10:00 AM on April 9
• from 10:00 PM on April 9 to 10:00 AM on April 10 (reservation)

HORELICA tunnel
• from 10:00 PM on April 8 to 10:00 PM on April 10

ŠIBENIK tunnel
• from 10:00 PM on 22 April to 4:00 PM on 23 April (only the left tunnel tube towards Žilina)
• from 00:00 on 23 April to 6:00 PM on 24 April (only the right tunnel tube towards Prešov)

POVAŽSKÝ CHLMEC tunnel
• from 12:00 on April 28 to 10:00 PM on May 1

BÔRIK tunnel
• from 10:00 PM on May 6 to 6:00 PM on May 7 (only the left tunnel tube towards Žilina)
• from 00:00 on May 7 to 6:00 PM on May 9 (only the right tunnel tube towards Prešov)

PREŠOV tunnel
• from 10:00 PM on May 13 to 10:00 AM on May 20 (only the left tunnel tube towards Žilina)
• from 00:00 on May 14 to 12:00 on May 20 (only the right tunnel tube towards Košice)

ŽILINA and OVČIARSKO tunnels
• from 12:00 on May 18 to 10:00 PM on May 22

BRANISKO tunnel
• from 00:00 on May 21 to 6:00 PM on May 27

SVRČINOVEC and POLANA tunnels
• from 10:00 PM on May 27 to 10:00 PM on May 29

Lučivná underground passage
• from 08:00 AM to 6:00 PM on June 25 (the left tunnel tube towards Žilina)
• from 08:00 AM to 6:00 PM on June 26 (the right tunnel tube towards Košice)

Slovakia lifts holiday HGV driving bansPrev
Slowakei: Vollsperrungen von TunnelnNext

Latest Posts

by

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete...

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

UnkategorisiertJanuar 7, 2026
by

Emergency Closure of the Branisko Tunnel in Slovakia

The Polícia SR – Prešovský kraj has announced an emergency closure of the Branisko Tunnel on the D1 motorway in the Prešov region.The restrictions apply to...

Emergency Closure of the Branisko Tunnel in Slovakia

Unkategorisiert, UnkategorisiertDezember 22, 2025
by

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway...

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

Unkategorisiert, UnkategorisiertDezember 22, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten