Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertDezember 22, 20250 comments

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway near Bratislava towards the Slovak capital is planned.

The closed section covers the route from the Bernolákovo junction to the Zlaté Piesky area, while traffic in the opposite direction will remain unaffected. The works, related to the modernization and connection of the D1 motorway with the D4, require a temporary traffic restriction.

During the weekend, activities will include, among others, the renewal of horizontal road markings and the repositioning of safety barriers. These restrictions will allow the continuation of the modernization of the original D1 pavement and simultaneously facilitate drivers’ access to Bratislava from the Trnava direction. The planned closure is subject to weather conditions.

Traffic will be diverted onto the Old Senec Road I/61. The police urge drivers to exercise particular caution, especially at night and during periods of increased truck traffic.

The modernization of the D1 in front of Bratislava and the D1/D4 junction is the largest road investment in western Slovakia. Upon completion, drivers will benefit from a fully functional motorway on this key section.

Detour Map

Daily New Restrictions. List of Roads Closed to Heavy Trucks in HungaryPrev
Night works in the Beneluxtunnel. A4 completely closed on 8-9 DecemberNext

Latest Posts

by

Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights

For the next few nights, an important connection between the E25 and E40 motorways in Liège will be closed. The disruptions will affect the A602 tunnel ring...

Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026
by

New vignette rates in Latvia. Trucks will pay more

New road toll rates for heavy transport are now in force in Latvia. The changes took effect on March 1 and apply to vehicles with a gross vehicle weight...

New vignette rates in Latvia. Trucks will pay more

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026
by

France: ELO mandatory for trucks travelling to the United Kingdom from April

From April 20, 2026, France will introduce a mandatory ELO system for trucks crossing the border with the United Kingdom. A single barcode will contain all...

France: ELO mandatory for trucks travelling to the United Kingdom from April

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten