Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertNovember 28, 20250 comments

Modernization of Tunnels on Spain’s A-66: Detours and Night Closures in Asturias

Major modernization works are underway on the A-66 motorway in Asturias, focusing on the Ángel Uriel and El Padrún tunnels. The goal of the project is to improve safety and air quality inside the tunnels through the installation of new ventilation systems. During the works, drivers should expect traffic disruptions and designated detours.

The Ministry of Transport and Sustainable Mobility announced that the modernization includes the installation of new fans and power cables, which will enhance traveler safety, particularly in the event of a fire. The project is being carried out under the Recovery, Transformation and Resilience Plan (PRTR), financed by the European NextGenerationEU funds. The total budget amounts to €7.26 million.

Due to the installation of ventilation equipment in the El Padrún tunnel, night closures have been scheduled:
❌ November 3 and 4 – closure of the León-bound tube, from 22:00 to 07:00
❌ November 5 and 6 – closure of the Oviedo-bound tube, also from 22:00 to 07:00

To maintain traffic flow on the A-66 motorway, the following detours have been arranged:

❌ Direction León:
Traffic will be diverted to the N-630 road, between exit 35 and the Cardeo junction.
For local connections between Olloniego and Mieres, an alternative route is available via the AS-116 road, from which drivers can access the AS-I mining motorway.

❌ Direction Oviedo:
Between km 41 and km 43, traffic will be shifted to a single carriageway, using existing crossovers between the lanes.

These works are part of Spain’s ongoing effort to adapt its tunnel network to current EU safety standards. The investment aims to improve driving conditions and reduce the risk of serious incidents in tunnel infrastructure that plays a vital role in regional transport.

Las noches del 3, 4 y 5 de noviembre se producirán afectaciones al tráfico en el túnel de El Padrún (A-66, Asturias) para poder colocar los nuevos ventiladores que mejorarán la calidad del aire y aumentarán la protección en caso de incendio.

ℹ️ https://t.co/07zdYkwn3H pic.twitter.com/xowO92FweL

Italy introduces a truck overtaking ban on the A1 motorway – 90 km of restrictionsPrev
Calculator of Fines for Drivers’ Driving and Rest Time in GermanyNext

Latest Posts

by

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete...

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

UnkategorisiertJanuar 7, 2026
by

Emergency Closure of the Branisko Tunnel in Slovakia

The Polícia SR – Prešovský kraj has announced an emergency closure of the Branisko Tunnel on the D1 motorway in the Prešov region.The restrictions apply to...

Emergency Closure of the Branisko Tunnel in Slovakia

Unkategorisiert, UnkategorisiertDezember 22, 2025
by

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway...

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

Unkategorisiert, UnkategorisiertDezember 22, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten