Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertNovember 1, 20250 comments

German A59 closed for one year. Detours via A46, A3 and A57

Starting October 15, 2025, a major reconstruction project will begin on the A59 motorway in North Rhine-Westphalia. Due to the works, truck and passenger vehicle drivers will face significant traffic disruptions that are expected to last until the end of September 2026.

According to the operator of the German motorway network, from October 15 (9:00 p.m.), the A59 section between the Düsseldorf-Süd interchange and the Richrath exit will be closed. The next phase will start on October 20, when the remaining section between Richrath and Monheim will also be closed. The complete closure of the Düsseldorf-Süd – Monheim section will remain in place until September 30, 2026. After this phase, roadworks will continue on the carriageway towards Düsseldorf.

❌ During the construction period, detours will be set up via motorways A46, A3, A542, and A57 (alternatively A1). For local traffic, shorter detours along secondary roads will be marked on-site.

The A59 corridor is an important route in the Rhine-Ruhr metropolitan area, connecting the southern outskirts of Düsseldorf with Cologne and Leverkusen. The long-term closure will require redirecting heavy truck traffic to the parallel corridors A3 and A57, which may lead to increased congestion on those routes.

Slovak Carriers Renew Fight to Lift Truck Overtaking BanPrev
Antwerp: Major Traffic Disruptions for Trucks in NovemberNext

Latest Posts

by

Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights

For the next few nights, an important connection between the E25 and E40 motorways in Liège will be closed. The disruptions will affect the A602 tunnel ring...

Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026
by

New vignette rates in Latvia. Trucks will pay more

New road toll rates for heavy transport are now in force in Latvia. The changes took effect on March 1 and apply to vehicles with a gross vehicle weight...

New vignette rates in Latvia. Trucks will pay more

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026
by

France: ELO mandatory for trucks travelling to the United Kingdom from April

From April 20, 2026, France will introduce a mandatory ELO system for trucks crossing the border with the United Kingdom. A single barcode will contain all...

France: ELO mandatory for trucks travelling to the United Kingdom from April

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten