Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertAugust 28, 20250 comments

Mont Blanc Tunnel Closed for Over 3 Months

From Monday, 1 September at 17:00 until Friday, 12 December at 17:00, the Mont Blanc Tunnel will be completely closed to traffic. The closure is due to work associated with the second phase of the test renovation of the tunnel vault.

The works will cover two sections with a total length of 254 metres and constitute a continuation of the first test phase carried out in autumn 2024. Due to the nature of the work, the tunnel geometry, and the necessity to dismantle all technological infrastructure in the work zones, even temporary passage will not be possible. Autumn was chosen as the period least disruptive for tourism and the local economy.

The Mont Blanc Tunnel, now 60 years old, is the first major European tunnel to undergo such an advanced renovation, involving both the vault and the sub-roadway structure. The test works in 2024 and 2025 aim to determine the best methods for the tunnel’s further renovation.

It is estimated that around 90% of trucks will be diverted towards the Fréjus Tunnel, while light vehicles will be split, depending on their travel direction, between Grand-Saint-Bernard, Fréjus, and alpine passes.

The validity of all subscriptions (for 10 or 20 trips) that are active on the day the full closure begins (1 September 2025) will be automatically extended by 4 months. The extension will occur automatically, so no application will be required.

Temporary Truck Traffic Ban on DN39 in RomaniaPrev
A46 in Germany closed in both directions ➡ detours in placeNext

Latest Posts

by

E17 in Belgium closed overnight from July 22 to 23 ➡ Detour routes

During the night from Tuesday, July 22 to Wednesday, July 23, the E17 motorway in Belgium will be completely closed in both directions between the...

E17 in Belgium closed overnight from July 22 to 23 ➡ Detour routes

UnkategorisiertAugust 28, 2025
by

A46 in Germany closed in both directions ➡ detours in place

Drivers traveling through North Rhine-Westphalia this coming weekend should prepare for major disruptions. Due to construction work in the...

A46 in Germany closed in both directions ➡ detours in place

UnkategorisiertAugust 28, 2025
by

Mont Blanc Tunnel Closed for Over 3 Months

From Monday, 1 September at 17:00 until Friday, 12 December at 17:00, the Mont Blanc Tunnel will be completely closed to traffic. The closure is due to work...

Mont Blanc Tunnel Closed for Over 3 Months

UnkategorisiertAugust 28, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten