Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertMärz 19, 20250 comments

Slovenia: complete closure of the A1 motorway and and narrowed lanes on the A1, A2, A4 and A5

In the coming days, drivers in Slovenia can expect disruptions on the A1, A2, A4 and A5 motorways, which include complete closures, alternating traffic and lane narrowing.

Complete closure of the A1

The the A1 motorway between Brezovica and Vrhnika will be completely closed in both directions during three nights (10:00 PM to 4:00 AM) from Tuesday, 11 February to Friday, 14 February. A diversion route has been designated along a regional road. Additionally, work will be carried out on the emergency lane along the Kozina – Črni Kal section until early March.

Roadworks on the A1

Modernisation of the emergency lanes along the Arja Vas – Domžale section will continue until 16 February. As a result, single-lane traffic will be introduced on the following dates:
• 12 February (Wednesday) between 8:00 AM and 11:00 AM on the Blagovica – Krtina section towards Maribor,
• 13 February (Thursday) between 11:00 AM and 3:00 PM towards Ljubljana,
• 16 February (Sunday) between 8:00 AM and 1:00 PM on the Trojane – Blagovica section towards Ljubljana.
Additionally, until 14 February, single-lane traffic will be in place between the Dragučova junction and the Maribor East exit towards Ljubljana.

Single-lane traffic on the A2

• On Wednesday, February 12, there will be single-lane traffic on the Trebnje West and Trebnje East sections. Between the Bič and Trebnje West exits towards Obrežje, traffic will be conducted along two narrowed lanes – the works are scheduled to be completed in early April.
• Delays can also be expected in the Karawanki tunnel – on the night of February 11 to 12 (Tuesday/Wednesday), as a result of alternating traffic between 8:00 PM and 6:00 AM.
Roadworks on the A4 and A5
• There will be singler-lane traffic on various sections of the A5 until February 14, including: between the Sveta Trojica – Lenart – Pernica exits, and on 11-13 February on the Cerkvenjak – Sveti Jurij, Vučja Vas – Murska Sobota and Lipovci – Turnišče – Lendava – Pince.
• On the A4, work will be carried out daily on the Slivnica – Draženci, Draženci – Most Puh and Draženci – Gruškovje section until 14 February.

Closures of regional road

Traffic disruptions will also affect local roads.
The Vavta Vas – Dolenjske Toplice – Podturn regional road in Dolenjske Toplice will be closed until 1 April due to the reconstruction of the bridge. A diversion has been created via Dolenjske Toplice – Straža – Soteska – Podturn.

An Austrian industry association wants an end to the night-time HGV driving banPrev
Weekend Traffic Disruptions on the Route to the Netherlands – No Passage Through Beveren and Tijsmans TunnelsNext

Latest Posts

by

Traffic Disruptions in Hungary Due to the Tour de Hongrie – List of Road Closures and Detours

The Tour de Hongrie 2025 kicks off on May 13, and drivers across Hungary – including in Budapest – should expect temporary road closures and detours due to...

Traffic Disruptions in Hungary Due to the Tour de Hongrie – List of Road Closures and Detours

UnkategorisiertJuni 28, 2025
by

Germany Tightens Border Controls – Drivers Should Expect Delays

The new German federal government, following the announcements of Interior Minister Alexander Dobrindt, is introducing even stricter controls at national...

Germany Tightens Border Controls – Drivers Should Expect Delays

UnkategorisiertJuni 28, 2025
by

Closed Access to A2 towards Świecko. Detours via DK92 from May 17

Starting May 17, the first phase of pavement renovation will begin at the Poznań Wschód motorway interchange, where the A2 motorway intersects with the S5...

Closed Access to A2 towards Świecko. Detours via DK92 from May 17

UnkategorisiertJuni 26, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten