Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertFebruar 13, 20250 comments

Tirol: traffic restrictions on the Lueg Bridge in 2025

In cooperation with the local authorities, the ministry and partners, ASFINAG has prepared a detailed schedule of traffic measures on the Lueg Bridge, which comes into effect on 1 January 2025.

The schedule is supposed to to enable drivers to plan their journeys on the A13 motorway once single-lane traffic on the bridge is in place. The measure is necessary to reduce the load exerted on the bridge and ensure traffic safety. Innovative traffic management solutions will be used to minimise disruptions, but drivers should expect periodic changes and adapt their travel plans to the new conditions.

Two-lane traffic on selected days

To minimise disruptions, ASFINAG plans to allow two-lane traffic in each difrection on 180 days when traffic intensity is predicted to be much higher. On these days:

❌ Vehicles with a GVW of over 3.5 tons will be obliged to use the inner lane (closest to the middle of the bridge).
❌ Cars will be able to use both lanes.
Depending on the situation, two-lane traffic will be enabled on the southbound or the northbound carriageway, or in both directions at the same time.

Schedule of restrictions❗

HGV driving bans

Despite two-lane traffic, considerable traffic jams may occur on some days. This is why there will be 14 days with an HGV driving ban for vehicles with a GVW of over 7.5 tons on the southbound carriageway. In total, in 2025, there will be:

❌ 36 days with an HGV driving ban on the southbound carriageway,
❌ 21 days with an HGV driving ban on the northbound carriageway.

Schedule of restrictions ❗

Intensive preparations for the introduction of the new traffic organization have been underway for several months. Work will continue in 2025 according to the following schedule:
❌ January 1, 2025 – the introduction of single-lane traffic on the bridge.
❌ end of January 2025 – weather permitting, first days with two-lane traffic.
❌ Spring 2025 – completion of the installation of the automated traffic control and management system.
In the event of snowfall, two-lane traffic cannot be introduced because snow removal trucks will not be able to use the outer lanes of the bridge.

Maintenance operations in the Fréjus TunnelPrev
Update! Austria: exit bans on the A10 motorway to prevent traffic jam avoidanceNext

Latest Posts

by

Austria: additional restrictions on the A10 from April to June

A regulation issued by the Austrian Minister of Innovation, Mobility and Infrastructure on 16 April introduces additional HGV driving bans on the A10...

Austria: additional restrictions on the A10 from April to June

UnkategorisiertMai 31, 2025
by

Slovakia Eases Truck Driving Bans on May 1 and 8 ➡ Details

In connection with the upcoming public holidays, the Presidium of the Police Force of the Slovak Republic, at the request of the ČESMAD Slovakia...

Slovakia Eases Truck Driving Bans on May 1 and 8 ➡ Details

UnkategorisiertMai 31, 2025
by

Attention! Austria has announced new truck bans – effective from today

The Austrian Ministry of Innovation, Mobility and Infrastructure has published the 72nd regulation regarding additional driving bans for heavy goods...

Attention! Austria has announced new truck bans – effective from today

UnkategorisiertMai 23, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten