Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertAugust 31, 20240 comments

Romania: DN 7 closed to HGV traffic for a month

The National Road Infrastructure Management Company (CNAIR) in Romania has informed that the section of the national road DN 7 between km 242 and km 250 will be closed to traffic from July 8 to August 9 from 06:00 AM and 8:00 PM owing to clean-up operations on the road embankment.

Diversion routes:

For vehicles with a GVW over 7.5 t:
❌ Between Bucharest – Vește (Sibiu) and back:
◾ Bucharest → A3 → Ploiești → DN1A → Brașov → DN 1 → Veștem – intersection with DN 7

❌ Between Pitești – Brasov and back:
◾ Pitești → DN73 – A3 → Râșnov → Brașov

❌ Between Bucharest – A1 Simeria (as well as the western, central and northern parts of the country) and back:
◾ Bucharest → A1 → Pitești → DN7 → Râmnicu Vâlcea → DN67 → Târgu Jiu → DN66 → Simeria → Simeria A1 road junction
◾ Bucharest → A1 → Pitești → DN65 – DEx12 → Craiova → DN6 → Filiași → DN66 → Târgu Jiu → DN66 → Simeria → Simeria A1 road junction
◾ Bucharest → A1 → Pitești → DN65 – DEx12 → Craiova → DN6 → Dr. Tr. Severin → DN6 → Lugoj → A6 → Lugoj A1 road junction
◾ Bucharest → DN6 → Alexandria → DN6 → Craiova → DN6 → Filiași → DN66 → Târgu Jiu → DN66 → Simeria → Simeria A1 road junction
◾ Bucharest → DN6 → Alexandria → DN6 → Craiova → DN6 → Dr. Tr. Severin → DN6 → Lugoj → A6 → Lugoj A1 road junction.

Vehicles with a GVW below 7.5 t can use national and district roads located near the closed section of DN7. Steps have also been taken to enable vehicles with a GVW of up to 30 t to use the DN10 road from Buzău to Brașov. In addition, no other traffic restrictions will be introduced on the diversion routes during the closure of DN 7 and, if any bans are in effect, they will be lifted as soon as possible.

Map with detour routes

M25 completely closed over the weekendPrev
Romania and Bulgaria introduce a sudden HGV driving ban owing to a heat waveNext

Latest Posts

by

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete...

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

UnkategorisiertJanuar 7, 2026
by

Emergency Closure of the Branisko Tunnel in Slovakia

The Polícia SR – Prešovský kraj has announced an emergency closure of the Branisko Tunnel on the D1 motorway in the Prešov region.The restrictions apply to...

Emergency Closure of the Branisko Tunnel in Slovakia

Unkategorisiert, UnkategorisiertDezember 22, 2025
by

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway...

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

Unkategorisiert, UnkategorisiertDezember 22, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten