Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertMai 25, 20240 comments

Austria: additional driving bans in 2024

By virtue of a regulation of March 28, the Federal Ministry of Climate Protection, Environment, Energy, Mobility, Innovation and Technology has published a calendar of additional driving bans for 2024.

The ban applies to vehicles or articulated vehicles with a maximum gross weight exceeding 7.5 t on the following dates:
◾ March 29 from 4:00 PM to 10:00 PM, March 30 from 11:00 AM to 3:00 PM and April 25 from 11:00 to 10:00 PM, on the A 12 motorway in the Inn Valley and on the A 13 motorway via the Brenner Pass if the destination is located in Italy or can only be reached via Italy;

◾ on all Saturdays from July 6 to August 31 inclusive, from 7:00 AM to 3:00 PM on the A 12 motorway in the Inn Valley and on the A 13 motorway via the Brenner Pass, if the destination is located in Italy or can only be reached via Italy,

◾ on March 29 and October 3 from 12:00 to 10:00 PM and on all Saturdays from July 6 to August 31 from 7:00 AM to 3:00 PM on the A 12 motorway in the Inn Valley and on the A 13 motorway through the Brenner Pass if the destination is located in Germany or can only be reached via Germany,

◾ on all Saturdays from July 6 to August 31 inclusive from 8:00 AM to 3:00 PM outside built-up areas in both directions on the following roads:
a) Loferer Straße B 178 from Lofer to Wörgl;
b) Ennstalstrasse B 320 from km 4,500;
c) Seefelder Straße B 177 along its entire length;
d) Fernpass B 179 road from Nassereith to Biberwier;
e) Achensee Straße B 181 along its entire length;
f) Brenner Straße B 182 along its entire length

◾ on all Saturdays from June 29 to August 31 inclusive, from 8:00 AM to 3:00 PM on the A 4 motorway from the Schwechat junction to the state border at Nickelsdorf in both directions, with the exception of terminating and originating traffic to and from the municipalities of Neusiedl am See, Eisenstadt, Eisenstadt-Umgebung, Rust, Mattersburg, Bruck an der Leitha, Gänserndorf and Korneuburg.

Tyrol: two extra days of traffic restrictions on the A13Prev
Closure of the Arlberg tunnel – diversions for HGV trafficNext

Latest Posts

by

Catalonia – Reinstatement of Permanent Truck Ban on N-340

The Catalan Traffic Service (SCT) has announced the reinstatement of the permanent traffic ban for heavy goods vehicles over 26 tons on the N-340 road,...

Catalonia – Reinstatement of Permanent Truck Ban on N-340

UnkategorisiertAugust 11, 2025
by

A22 Brennero – Additional Saturday Traffic Ban for Trucks from July 5 to August 30

From July 5 to August 30, 2025, an additional traffic ban for heavy goods vehicles with a gross vehicle weight (GVW) over 7.5 tons will be in effect on the...

A22 Brennero – Additional Saturday Traffic Ban for Trucks from July 5 to August 30

UnkategorisiertAugust 1, 2025
by

Tour de France 2025: Road Closures & Traffic Restrictions in Northern France and Normandy

From 5 to 10 July 2025, the Tour de France will traverse northern France and Normandy. As a result, professional drivers should expect significant traffic...

Tour de France 2025: Road Closures & Traffic Restrictions in Northern France and Normandy

UnkategorisiertJuli 25, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten