Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertApril 9, 20240 comments

England: closure of M25 – diversion routes

The M25 will be closed for a full weekend for the first time ever as a major project progresses to make journeys safer and reduce pollution. This will be the first of five closures between now and September 2024. Those travelling to Gatwick and Heathrow airports and Channel ports may be affected.

The Junction 10 improvement scheme will see an increase in the number of lanes to make journeys safer and improve traffic flow. It will also make it easier and safer to enter and exit the M25, provide safer entry roads for Wisley, Pyrford, Old Byfleet and RHS Wisley.

National Highways will shut the M25 in both directions between junctions 10 (A3 Wisley) and 11 (A320 Chertsey Interchange) from 9:00 PM on Friday, March 15, to 6:00 AM on Monday, March 18, to demolish the Clearmount bridleway bridge and install a very large gantry.

The local diversion route below will be in place which is the same for both directions:

Junction 10 – Junction 11: North bound A3 to Painshill Junction, A245 towards Woking, and then A320 to M25 Junction 11.

Junction 11 – Junction 10: A320 south towards Woking, A245 towards Byfleet and Painshill junction, Southbound A3 to Junction 10.

Taking the M25 in the other direction to avoid our closure is also an option.
The next full closure of the M25 is due to take place in April to allow for the installation of the new Clearmount bridleway bridge. Dates are subject to change.

Tirol: 150 days with HGV inspections in 2024Prev
Le Shuttle: Planned overnight service suspension on 16/17 MarchNext

Latest Posts

by

Spain: List of Truck Traffic Restrictions for 6 and 8 December

Early December will bring two public holidays in Spain, during which numerous traffic restrictions for heavy goods vehicles will be in force.On 6 December,...

Spain: List of Truck Traffic Restrictions for 6 and 8 December

Unkategorisiert, Unkategorisiert, UnkategorisiertJanuar 18, 2026
by

From 2026, trucks over 7.5 t will no longer be allowed on Route 42. Hungary redirects traffic to the M4

Hungary is introducing a ban on trucks over 7.5 tonnes on National Road 42. Transit traffic will be diverted to the M4 motorway.Starting in 2026, vehicles...

From 2026, trucks over 7.5 t will no longer be allowed on Route 42. Hungary redirects traffic to the M4

Unkategorisiert, Unkategorisiert, UnkategorisiertJanuar 18, 2026
by

Netherlands: Road Disruptions from 12 to 15 December

From Friday, 12 December, to Monday, 15 December, truck drivers in the Netherlands should expect significant disruptions on two major motorway sections: A10...

Netherlands: Road Disruptions from 12 to 15 December

Unkategorisiert, Unkategorisiert, UnkategorisiertJanuar 18, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten