Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertOktober 4, 20230 comments

Postponement of the total closure of the Mont Blanc Tunnel

Initially scheduled for Monday 4 September, the start of the reconstruction of the tunnel connecting Chamonix-Mont-Blanc in France with Courmayeur in Italy, has been postponed owing to the closure of the Fréjus Tunnel to HGV traffic.

As a result, the Mont Blanc Tunnel will remain open until the A43 motorway and the Fréjus Tunnel are reopened to HGV traffic. The 15-week closure of the Mont Blanc is estimated to be delayed by fewer than 8 days, depending on technical and weather conditions.

Vollständige Sperrung des Mont-Blanc-Tunnels für 9 aufeinanderfolgende WochenPrev
Polen und Tschechien führen vorübergehende Kontrollen an der Grenze zur Slowakei einNext

Latest Posts

by

Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave

The Hungarian Ministry of Construction and Transport, at the request of the national hauliers' association MKFE, has temporarily relaxed the weekend truck...

Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025
by

Hungary lifts night truck traffic ban on August 9–10 due to heatwave

Due to a heatwave, the night truck traffic ban for vehicles over 7.5 tonnes GVW will be temporarily lifted in Hungary from Saturday to Sunday night (9–10...

Hungary lifts night truck traffic ban on August 9–10 due to heatwave

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025
by

11 – 14 August: Night-time traffic interruptions in the Fréjus Tunnel

The Fréjus Tunnel operator has announced planned short-term closures of the facility from 11 to 14 August 2025.Since the opening of the tunnel’s second...

11 – 14 August: Night-time traffic interruptions in the Fréjus Tunnel

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten