Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertNovember 18, 20220 comments

Spain: A-9 completely closed

The closure is due to construction work on the bypass connection between AP-9 and A-54, located in the urban area of Santiago de Compostela.

The affected motorway sections include both lanes of the AP-9 between KP 55 (Sigüeiro intersection) and KP 67 (Santiago Norte intersection), which will be closed from 10:00 PM on Wednesday, October 26, to 6:00 AM on Thursday, October 27.

Traffic towards A Coruña
Drivers heading for A Coruña will have to exit the AP-9 directly in front of the construction area (exit 67, Santiago Norte junction) and follow the recommended alternative route along the northbound SC-20 if they want to reach the A-54 or the Santiago-Rosalía de Castro international airport, and the SC-20 / N-550 if they are heading for Sigüeiro (exit 55), with the possibility of returning to the AP-9 in the direction of A Coruña.

Traffic towards Pontevedra
Drivers heading for Pontevedra will have to exit the AP-9 directly in front of the construction area at the Sigüeiro junction (exit 55) and follow the recommended alternative routes along the N-550 towards Pontevedra, or the SC-20 bypass with the possibility of returning to the AP-9 bound for Pontevedra via the Santiago Norte junction (exit 67).
In addition to standard vertical signs, information about the closure will be displayed on VMS panels along the AP-9 and information posters erected directly at motorway exits.

Deutschland – Sperrung eines Abschnitts der Autobahn A7 bei HamburgPrev
Clarification on German HGV driving bans on October 31 and November 1Next

Latest Posts

by

Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave

The Hungarian Ministry of Construction and Transport, at the request of the national hauliers' association MKFE, has temporarily relaxed the weekend truck...

Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025
by

Hungary lifts night truck traffic ban on August 9–10 due to heatwave

Due to a heatwave, the night truck traffic ban for vehicles over 7.5 tonnes GVW will be temporarily lifted in Hungary from Saturday to Sunday night (9–10...

Hungary lifts night truck traffic ban on August 9–10 due to heatwave

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025
by

11 – 14 August: Night-time traffic interruptions in the Fréjus Tunnel

The Fréjus Tunnel operator has announced planned short-term closures of the facility from 11 to 14 August 2025.Since the opening of the tunnel’s second...

11 – 14 August: Night-time traffic interruptions in the Fréjus Tunnel

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten