
Czechia: D1 reopened, with a speed limit on around exit 370
The section of D1 motorway near Ostrava – Svinov has been reopened, which means that traffic on the motorway can continue as usual, except for a 60kph speed limit ona 2-kilometer section around exit 370.
The I/60 road has also been reopened in the morning. However, in two places before and at the beginning of Vápenná, traffic will have to continue on the hard shoulder until repairs on the main road have been completed.
Similar difficulties can be expected on the I/44 in the Česká Ves area and the I/46 in Opava, where the bridge is still closed and only accessible to pedestrians.
Oznacz jako wykorzystany
Latest Posts
Bulgaria Introduces New Weight Restrictions on the Petrohan Pass
As of July 4, 2025, a new traffic arrangement for heavy goods vehicles is in effect on the Mezdra–Botevgrad route in Bulgaria.From this date, the upgraded...
France – Closure of the A6 and A126 Motorways
As part of its annual infrastructure maintenance program, the Île-de-France Roads Directorate (DiRIF), which manages the national road network in the Paris...
Night Closures of Mont Blanc and Fréjus Tunnels – Disruptions on the France–Italy Route
Drivers planning to travel across the Alps on the France–Italy route should prepare for significant disruptions. In June 2025, night closures and...