Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)

Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
by
UncategorizedFebruary 10, 20240 comments

Changes in the Hungarian road toll system. Fines for a wrong axle category

From January 1, lorries with five or more axles must be classified into the J5 category, and not to J4, as was the case before.

One of the changes in the Hungarian road toll system from January 1, 2024 is the introduction of the J5 axle category, which includes five-axle vehicles combinations even if one of the rear axles is lifted while driving. Failure to enter the correct number of axles may result in fines. From January 1 the J4 category can only be applied to four-axle vehicles. Operators of vehicles with five or more axles can provide information about the number of axles via the HU-GO website or their on-board devices.

Drivers who use the HU-GO system should be aware that the toll rate for using Hungarian roads is based on the total number of axles their vehicle has, even if the lift axles are raised and do not touch the road.
France:additional HGV driving ban in winter and summerPrev
Disruptions on the Alpine route – closures of the Mount Blanc tunnelNext

Latest Posts

by

Norway relaxes regulations for truck drivers after landslide on E6 route

Following a landslide in Levanger, Norway, which blocked a key section of the E6 transport route, authorities have introduced extraordinary measures for...

Norway relaxes regulations for truck drivers after landslide on E6 route

UncategorizedOctober 11, 2025
by

Austria: Night-time closures of the Arlberg Tunnel from 22 September this year

The Arlberg Tunnel on Austria’s S16 road will be completely closed due to maintenance works from Monday, 22 September to Friday, 26 September 2025, each...

Austria: Night-time closures of the Arlberg Tunnel from 22 September this year

UncategorizedOctober 11, 2025
by

Belgium: Night closures of the E25/E40 connection at the Burenville interchange

Drivers in Belgium face further disruptions. Due to renovation works on the bridge at interchange no. 33 Burenville, night closures of the E25/E40...

Belgium: Night closures of the E25/E40 connection at the Burenville interchange

UncategorizedOctober 11, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Avice Group

Avice Group – is an international company. 365 days a year we are engaged in cargo transportation. Delivering cargo even to the farthest corners of Europe.

Appricotsoft.com Development

Head Office

Poland

30-415 Krakow ul. Bonarka 21, PL 

email: [email protected] 

Get Contacts