
Altona Tunnel: 55-hour closure of the A7
Work on the expansion of the eight-lane A7 motorway and the construction of a new noise protection tunnel on the Altona section is underway. The next step will involve removing the last structural component of the viaduct, which means the motorway has to be closed.
According to information provided by Autobahn GmbH, the A7 motorway will be completely closed from 20:00 PM on Friday, June 7, until 5:00 AM on Monday, June 10.
❌ southbound carriageway, between the intersections HH-Stellingen (26) and HH-Heimfeld (32),
❌ northbound carriageway, between the junctions HH-Heimfeld (32) and HH-Volkspark (27).
Diversion routes:
During the closures through and local traffic in both directions will be diverted along the A1, A21 and B205 motorways, and information for drivers will be displayed on VMS panels.
❌ traffic from the south from the Buchholzer triangle (43) / Horster triangle (40), through Maschener Kreuz (39), then along the A1 motorway.
❌ Drivers are advised to avoid Hamburg. Traffic from the from the north, should follow along the B205 from the Neumünster-Süd junction (15).
Latest Posts
September 15 with exemption from truck bans in Slovakia
The Presidium of the Slovak Police has reviewed the request of the Road Haulage Association of the Slovak Republic, CESMAD Slovakia, and has granted a...
September 15 with exemption from truck bans in Slovakia
Nighttime closures of the Van Brienenoord Bridge on the A16 in Rotterdam – detours and disruptions
In mid-September, drivers will face major disruptions on the A16 motorway in Rotterdam. Due to maintenance works, the Van Brienenoord Bridge will be closed...
Bulgaria: August Restrictions for Trucks on the Trakia Motorway
In August, Bulgaria is introducing additional traffic restrictions for heavy goods vehicles over 12 tonnes on the Trakia Motorway (A1), on the section...