
Altona Tunnel: 55-hour closure of the A7
Work on the expansion of the eight-lane A7 motorway and the construction of a new noise protection tunnel on the Altona section is underway. The next step will involve removing the last structural component of the viaduct, which means the motorway has to be closed.
According to information provided by Autobahn GmbH, the A7 motorway will be completely closed from 20:00 PM on Friday, June 7, until 5:00 AM on Monday, June 10.
❌ southbound carriageway, between the intersections HH-Stellingen (26) and HH-Heimfeld (32),
❌ northbound carriageway, between the junctions HH-Heimfeld (32) and HH-Volkspark (27).
Diversion routes:
During the closures through and local traffic in both directions will be diverted along the A1, A21 and B205 motorways, and information for drivers will be displayed on VMS panels.
❌ traffic from the south from the Buchholzer triangle (43) / Horster triangle (40), through Maschener Kreuz (39), then along the A1 motorway.
❌ Drivers are advised to avoid Hamburg. Traffic from the from the north, should follow along the B205 from the Neumünster-Süd junction (15).
Latest Posts
Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave
The Hungarian Ministry of Construction and Transport, at the request of the national hauliers' association MKFE, has temporarily relaxed the weekend truck...
Notice: Weekend Closure of the Považský Chlmec Tunnel on the D3 in Slovakia
Drivers traveling through northern Slovakia this coming weekend should prepare for disruptions. From Friday, July 18 at 8:00 p.m. until the evening of...
Traffic Disruptions on the S1 Route – Laliki Tunnel Temporarily Closed
Drivers traveling on the S1 expressway toward the Zwardoń border crossing should prepare for significant traffic disruptions. The road tunnel in Laliki will...