
A4: Closures of the Königshainer Berge tunnel in the direction of Dresden
The tunnel will be closed from 8:30 AM on July 5 to 6:00 PM on July 9 and from8:30 AM on July 12 to 6:00 PM on July 16.
The diversion route (U 4) in the direction of Dresden starts at the Kodersdorf junction and leads to the Nieder Seifersdorf junction. In addition, the Wiesaer Forst car park along the Dresden-bound lane will be closed on the day before each of the two closure periods.
The resurfacing works are already being used to upgrade the northern tube so that all traffic on the A 4 can be routed through it in 2025.
On the 11th and 12th of July, the Königshainer Berge tunnel in the direction of Görlitz will be closed from 7:00 AM to 5:00 PM owing to maintenance works. The diversion route (U 5) starts at the Nieder Seifersdorf junction and leads to the Kodersdorf junction.
Latest Posts
Slovakia: Exception to the truck driving ban during the upcoming public holidays
The Presidium of the Police Corps of the Slovak Republic has granted a special permit allowing heavy goods vehicles to operate on 24, 25 and 26 December, as...
Winter Restrictions for Diversion Traffic in Tyrol
From 20 December 2025, Tyrol will introduce transit traffic restrictions on selected secondary roads in the districts of Schwaz, Kufstein, Reutte, Imst...
Winter Restrictions for Diversion Traffic in Tyrol
Austria: one night-time ban, two hours. Where does the confusion come from?
Across the whole of Austria, a nationwide night-time ban on heavy goods vehicles is in force every day from 22:00 to 5:00. It applies to vehicles with a...