Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)

Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
by
UncategorizedAugust 21, 20250 comments

Netherlands: A16 and A12 closures – drivers must expect long detours

When planning trips through the Netherlands in the second half of August and in September, drivers should prepare for major disruptions on two strategic routes – the A16 near Rotterdam and the A12 towards Utrecht.

Works on the A16 – bridge replacement and preparations for the opening of a new section

Rijkswaterstaat is entering the final phase of replacing the viaduct over Hoofdweg on the A16 motorway near Rotterdam. The upgrade is part of preparations for the opening of the new A16 Rotterdam section in October 2025, as well as major maintenance works between the Terbregseplein and Ridderkerk junctions. In August and September, drivers should expect full or partial closures of the route and diversions that may extend travel times by up to 60 minutes.

Dates and scope of closures

A total of five weekends of disruptions are planned:
❌ 22–25 August – complete closure of the carriageway towards A20 (Hoek van Holland/Gouda) between Ridderkerk and Terbregseplein junctions, except for the parallel lane between exits Feijenoord (24) and Centrum (25).
❌ 5–8 September and 12–15 September – closure of the parallel carriageway towards A20 on the same section (main carriageway remains open).
❌ 19–22 September and 26–29 September – complete closure of the carriageway towards Dordrecht between Terbregseplein and Ridderkerk junctions.

Slip roads and access roads may be blocked up to one hour earlier than the main motorway sections.

Detours

Traffic will be diverted via A20, A4 (Benelux Tunnel) and A15, which may add 30–60 minutes to travel time. Rijkswaterstaat urges drivers to plan journeys in advance, consider using public transport, or choose alternative routes.

From 17 August, preparatory works will begin on Hoofdweg, including the closure of exit 27 (Prins Alexander). In September, the City of Rotterdam will replace the traffic control system at Kralingseplein junction and renovate the Cornelis van Beveren cycle bridge over the A16.

Ten-day closure of the A12 – one of the main routes for traffic from Germany

Another major disruption concerns the A12 motorway towards Utrecht, between the Maanderbroek and Lunetten junctions. The road will be completely closed from 22 August to 1 September.

The A12 is one of the most important transport corridors in the Netherlands, especially for trucks coming from Germany towards The Hague and Rotterdam. The designated detour runs via A30, A1 and A27 – it is about 40 kilometers longer and may increase travel times by at least one hour. Authorities warn that during peak hours and summer travel periods, delays may be even greater. In the opposite direction – towards Arnhem – the road will remain open, though roadworks are also scheduled there.

Rijkswaterstaat calls on drivers to plan routes in advance, consider public transport, or use alternative connections to avoid the most severe disruptions.

Hungary Eases Truck Driving Ban – Drivers Gain a Nighttime WindowPrev
Bulgaria: August Restrictions for Trucks on the Trakia MotorwayNext

Latest Posts

by

Germany: A46 in Düsseldorf completely closed from Friday

The A46 motorway will be completely closed in both directions from August 15, 2025 at 9:00 p.m. until August 18, 2025 at 5:00 a.m.Due to a scheduled...

Germany: A46 in Düsseldorf completely closed from Friday

UncategorizedAugust 21, 2025
by

Bulgaria: August Restrictions for Trucks on the Trakia Motorway

In August, Bulgaria is introducing additional traffic restrictions for heavy goods vehicles over 12 tonnes on the Trakia Motorway (A1), on the section...

Bulgaria: August Restrictions for Trucks on the Trakia Motorway

UncategorizedAugust 21, 2025
by

Netherlands: A16 and A12 closures – drivers must expect long detours

When planning trips through the Netherlands in the second half of August and in September, drivers should prepare for major disruptions on two strategic...

Netherlands: A16 and A12 closures – drivers must expect long detours

UncategorizedAugust 21, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Avice Group

Avice Group – is an international company. 365 days a year we are engaged in cargo transportation. Delivering cargo even to the farthest corners of Europe.

Appricotsoft.com Development

Head Office

Poland

30-415 Krakow ul. Bonarka 21, PL 

email: [email protected] 

Get Contacts